Plant Summary

Plant Summary
Posted on 08/01/2024







Standardized Ventilation Measures Reporting

NPSC continues to optimize air quality in schools through improved ventilation and filtration. Implemented measures are dependent on the type of ventilation and feasibility within the context of school facilities and related building systems. This is a key element in the multiple protective strategies being employed to support healthier and safe learning environments for students and staff. Ventilation involves increasing the flow of outdoor/fresh air for diluting the concentration of any infectious particles. Filtration involves the use of different types of fibrous media designed to remove particles from the airstream.

 

  • All ventilation systems at NPSC schools have been assessed to ensure they are fully operational and serviced where necessary.

  • System inspections have taken place and will continue during the school year to ensure systems are operating properly.

  • Ventilation systems have been modified to increase the amount of incoming fresh air and have been programmed to operate longer hours to ensure occupied spaces have full air exchanges before, during, and after class time.

  • 290 stand-alone HEPA filters have been deployed to NPSC schools.

  • Stand-alone HEPA filtration units have been positioned in all occupied Kindergarten classrooms and all other occupied classrooms which do not have access to mechanical ventilation systems.

  • Stand-alone HEPA filtration units have also been provided in libraries, gyms, staff rooms and offices where mechanical ventilation is not available.

School Board Ventilation Strategy

Strategy

School Board Level Investments 

Investments

 
School Ventilation Profiles 

Project Renewal

School Name   Project Description   Start Date   Completion Date or
Anticipated Date
for Completion
  Percent
Complete
St. Joseph-Scollard Hall   Auditorium Renovation   1 May 2024   30 Jan 2026   0%
St. Joseph-Scollard Hall   Washroom Upgrade   23 Jun 2025   31 Aug 2025   0%
Our Lady of Sorrows    Parking Lot Upgrade   1 Jul 2025    31 Aug 2025   0%
Our Lady of Fatima   Roof Replacement   1 Jun 2025   30 Sep 2025   0%
Our Lady of Fatima   HVAC System Upgrade   1 Jul 2025   30 Sep 2025   0%
St. Francis   Roof Replacement   1 Jun 2025   30 Sep 2025   0%
St. Francis   HVAC System Upgrade   1 Jul 2025   30 Sep 2025   0%